Zhenjiang Great Wall Group Co.,Ltd

Best Goods, your smartest choice! Great Wall Products, The Great Wall Quality!

Manufacturer from China
Active Member
9 Years
Home / Products / Bailey Bridge /

Walkway bridge/ pedestrian bridgesidewalk/ steel pedestrian bridge/ Meeting ASTM GR65 Standard

Contact Now
Zhenjiang Great Wall Group Co.,Ltd
City:zhenjiang
Province/State:jiangsu
Country/Region:china
Contact Person:MsChen
Contact Now

Walkway bridge/ pedestrian bridgesidewalk/ steel pedestrian bridge/ Meeting ASTM GR65 Standard

Ask Latest Price
Video Channel
Brand Name :Great Wall
Model Number :CB100(CB321)
Certification :ISO,CE,SGS
Place of Origin :China
Price :Negotiated
Payment Terms :TT LC
Supply Ability :10,000TON each year
Delivery Time :Depending on the quantity
Packaging Details :Containers(20GP,40HC) Or In Bulks
MOQ :1 Set
Grade :JT-T 728-2008
Type :Heavy
Application :Steel Structure Bridge
Standard :ASTM|BS|DIN|GB
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Because of the advantages of fast erection and light structure of the assembled steel bridge, it can be used as a city pedestrian bridge. Beautiful and affordable. It's the first choice for many customers.
Product attributes
Name: Assembled Pedestrian Bridge
Nicknames: sidewalk; steel pedestrian bridge; urban pedestrian bridge; steel pedestrian bridge; temporary sidewalk; temporary sidewalk; Bailey pedestrian bridge;
Model: 321; 200; GW D; Special steel truss, etc.
Commonly used truss plate models: 321 type Bailey film, 200 type Bailey film, GW D type Bailey film, etc.
Maximum single span of steel bridge design: about 60 meters
Standard lane width of steel bridge: 1.2 meters, 1.5 meters, 2 meters or customized according to demand.
Load grade: Crowd load or small vehicle traffic. Generally not more than 5 tons.
Design scheme: According to the different spans and loads, select the appropriate arrangement.
Main Material of Steel Bridge: GB Q345B
Connection pin material: 30CrMnTi
Connection bolt grade: 8.8 grade high strength bolt; 10.9 grade high strength bolt.
Surface anti-corrosion: hot-dip galvanizing; paint; heavy-duty anti-corrosion paint for steel structure; asphalt paint; anti-skid aggregate treatment for bridge deck, etc.
Bridge erection methods: cantilever push-out method; in-situ assembly method; pile-up construction method; hoisting method; floating transportation method, etc.
Installation time: 3-7 sunny days after abutment and other conditions are met (determined by bridge length and site conditions)
Installation requirements: 5-6 workers (determined according to site conditions)
Installation equipment: crane, hoist, jack, hand hoist, welding machine, generator, etc. (adjustable according to site conditions)
Features of steel bridge: low cost, beautiful appearance, light fitting, rapid assembly, interchangeable, removable, long service life
Certification: ISO, CCIC, BV, SGS, CNAS, etc.
Implementation criteria: JT-T/728-2008
Manufacturer: Zhenjiang Great Wall Heavy Engineering Technology Co., Ltd.
Annual output: 12,000 tons

Inquiry Cart 0